Washington, North Carolina, established in 1776, was the first town in America named for George Washington. The banner features a profile of George Washington over a background of Washington scenes including the Washington Municipal Building, boats, and historic brick commercial buildings on the Washington waterfront.Washington, North Carolina, established in 1776, was the first town in America named for George Washington. The banner features a profile of George Washington over a background of Washington scenes including the Washington Municipal Building, boats, and historic brick commercial buildings on the Washington waterfront.Washington, North Carolina, established in 1776, was the first town in America named for George Washington. The banner features a profile of George Washington over a background of Washington scenes including the Washington Municipal Building, boats, and historic brick commercial buildings on the Washington waterfront.
Washington, North Carolina, established in 1776, was the first town in America named for George Washington. The banner features a profile of George Washington over a background of Washington scenes including the Washington Municipal Building, boats, and historic brick commercial buildings on the Washington waterfront. Washington, North Carolina, established in 1776, was the first town in America named for George Washington. The banner features a profile of George Washington over a background of Washington scenes including the Washington Municipal Building, boats, and historic brick commercial buildings on the Washington waterfront.
Content of interest to Washington residents.Content of interest to Washington businessesContent of interest to Washington utility customersContent of interest to Washington  visitorsDirectory of online services
     
     Planning &
     Development
Role of Department Zoning Applications & Forms Contact Us              Maps
Zoning Ordinance Permit Information & Applications Fee Schedules
Sign Ordinance Historic Preservation Population Data
Subdivision Ordinance Flood/Hurricane Information MSDD



Building Permit
Frequently Asked Questions

To Obtain a Permit:
Minimum Information needed to complete an application for a New Home Permit.
  1. Project Address
  2. Property owner's name.
  3. Tax Parcel # (may be obtained from the tax office, if not on file).
  4. Total contract cost.
  5. Each trade contractor, phone #, License #.
  6. Full description of work to be done.
  7. Plot plan showing dimensions of house, lot and accessory buildings.

Additional Information that may be needed.

  1. Flood elevation certificate.
  2. Septic tank permit.
  3. Plot Plan.
  4. CAMA Permit.
  5. Projects costing more than $30,000 require a licensed general contractor.
What Is The Cost Of The Permit?
Total cost for all trades is $0.26 per sq. ft. for single family dwellings.
Plus a fee of $5.00 for a State Homeowner Recovery Fund.
Inquire for permit cost on accessory buildings, porches, decks, etc..
Permit Fees
Building Permit Fees are required to be paid prior to beginning construction. All licensed contractors working within the city limits must have a current City Privilege License before a permit can be picked up in their name.
Can I Get A Permit The Same Day?
Generally, no. The application must be reviewed by zoning, public works and the health department, etc.. Usually three days are needed before the permit can be issued.

When Do I Call For An Inspection?
This needs to be coordinated with the inspector at the time the permit is issued.

What Types Of Inspections Are Required?
  1. Foundation
  2. Floor system.
  3. Rough-in for all trades.
  4. Insulation.
  5. Final for all trades-
    building, plumbing, electrical, mechanical and insulation.
What Is A Certificate Of Occupancy?
This document is issued when all construction complies with the requirements of the N.C. State Codes, allowing the resident to move into the home.
I Live Outside The City Limits, Do I Need A Permit?
Yes, as a minimum the Zoning Department (252-975-9384) will need to review your project for compliance.
Will I Need A Plot Plan?
Yes, showing all existing and/or proposed structures, including distances from the property lines. A copy of a survey map or a hand drawn copy to scale, if not already on file, will be accepted.
Floodplain Information
If your project is located within the 100 year floodplain, the finished floor must be elevated at or above the required height. A Flood Elevation Certificate will be required from a Licensed Registered Surveyor not later that 21 days after completion of the finished floor.
CAMA Permits Required
If the project is located in the Area of Environmental Concern, within 75' of a water body, a CAMA Permit will be required.
Septic Tank Permit
If the city does not provide sewer for your location, you will need to contact the Beaufort County Health Department (call 252-946-6048) to obtain a septic permit. This permit is required before the building permit can be issued.

Copyright by the City of Washington. All rights reserved. Last edited 1/24/04 .
Powered by
GovHost.com




Link to the City of Washington website home page Link to the City of Washington web site policies Send e-mail to cityinfo@washingtonnc.ws
City of Washington news and announcements
City of Washington government calender
City of Washington holiday schedule
City of Washington job opportunities and recruitment announcements
Local weather and forecasts from the National Weather Service
Map to Washington, NC from MapQuest.com
Complete map of all content on this website
Send e-mail to cityinfo@washingtonnc.ws
Search this website for specific content